Blast Permit Drafter
preview-b318.verified.foundry.dev
◆ Verified
Blast Permit StudioRidgeline Minerals · D&BDR
Planned blast
Stemming length (m)
8 m
Clearances
Permit packet◆ oracle-backed
BlastNW-B7 · Ring 12 · NW pit
Design78 holes · 165 mm · bench 7
Conditionexclusion-zone survey missing
Stemming8 m per design · design-cited
Blast method statementAssisted · review

The blast design specifies 8 m of stemming with the max instantaneous charge held below the vibration limit modelled at the village boundary. Charge-out follows the exclusion-zone survey and the shotfirer's misfire procedure per DMIRS Directive 0743.

Clearances · 3
Exclusion-zone survey Vibration & airblast model Misfire procedure
Policy citation · DMIRS Directive 0743 (v2025-09) · every field traces to a cited passage
blast_permit_drafter — register the Verified build as a typed, deterministic agent tool
j k appsh l tabsr verifyg o operate. actions⌘K commands? all keys